Advance Project Cost Estimation & Cost Control
Training Objective
After completing the course, participants should have:
1. In-depth knowledge and understanding about project cost planning and control.
2. To integrate and implement the ability. Various project management tool (WBS, Gantt chart, Network, etc) with cost accounting concept and techniques (Job Order Costing, Variance Analysis, etc). In project planning and control.
3. The ability to design a reliable, effective and efficient project cost accounting system. The ability and capacity to analyze and evaluate cost data and be able to prepare propose and decide action in order to control a preventive and corrective the project cost.
Design for
People who have a basic knowledge about Project Cost and Management, or attend Basic Project Cost Estimation and Cost Control trainning before.
Course Content
- Project Management and Cost Accounting Review
> Definition, Concepts, Technique and project planning and control tools.
> Cost Concept, Cost System and Accumulation - Project Cost Estimation
> Definition, classification, journal and accumulation
> Project Costing
Man Power
Material
Equipment
Overhead and Pre Project Costing - Project Cost Control
> Standard Costing
Definition
Setting the Standard
Cost Variance Analysis
Man Power
Material and Overhead
> Cost Control
Reporting
Analysis and Evaluation
4 Days Training